Book an on-site demonstration!
Book an on-site demonstration!
PermaGround enzymes, is an environmentally friendly, organic product that when used properly can provide great soil stabilization qualities for road construction, roadbeds, airstrips, storage yards, access roads and in military applications.
Whether you are looking to stabilize a high clay soil or trying decrease your overall construction
PermaGround enzymes, is an environmentally friendly, organic product that when used properly can provide great soil stabilization qualities for road construction, roadbeds, airstrips, storage yards, access roads and in military applications.
Whether you are looking to stabilize a high clay soil or trying decrease your overall construction costs, PermaGround is the tool for you. You can use PermaGround to create long lasting unpaved roads, low cost paved roads, and even pond lining.
By adding carbon to iron, we can make steel. By adding PermaGround to soil, we can make roads. Using our special enzyme formula, PermaGround bonds soil particles together to form a concrete-like surface that lasts 10 years or more. • Increases native soil strength by over 13X • Compatible with a variety of soils • Easy to use, no special equipment needed
One of the most expensive steps required in traditional road construction is the importing and exporting of aggregate. During this process, old material must be hauled out and new aggregate must be trucked in. With the application of PermaGround, you eliminate this step completely by utilizing the native soil as the road base. This can kn
One of the most expensive steps required in traditional road construction is the importing and exporting of aggregate. During this process, old material must be hauled out and new aggregate must be trucked in. With the application of PermaGround, you eliminate this step completely by utilizing the native soil as the road base. This can knock down your cost up to 80%. PermaGround’s unique permentation process causes the clay particles that live inside the native soil to bond with our special enzymes in the solution, creating a concrete-like surface that lasts over 10 years and is stronger than most traditional road bases.
Check out this great video
PermaGround - EnZyme is a non-toxic solution, and is NOT classified as posing any significant risk to human health, personal protection, physical hazard and is not flammable. However, it is recommended that the following general precautions be observed: Eye Protection Always wear proper eye protection. This product may splash during normal use. If contact with eyes is made, flush eyes with clean water immediately, for 10 minutes. If any adverse reaction occurs, seek medical attention. Skin Avoid prolonged skin contact by wearing gloves and long sleeves. If contact with skin is made, remove contaminated clothing and wash skin thoroughly with clean water and mild soap. In the rare case that PermaGround - EnZyme causes skin irritation, seek medical attention. Ingestion If swallowed, nausea or upset stomach may occur. Do not induce vomiting. Drink plenty of water to dilute. If symptoms persist, seek medical attention.
Clean Up Avoid spills and clean up immediately. Prevent product from spreading by using sand, earth, clay, or containment material to absorb spilled material. Slippery when spilled. Material Disposal Recover or recycle if possible. Do NOT dispose into drains, bodies of water, or environment. Solidify product and dispose in approved landfill. Check with local, regional, and/or national regulations for appropriate methods of disposal. Container Disposal Containers may be offered for recycling.
Commence Construction
Be sure that the weather does not call for rain and that the temperature is above 45oF. Excavate your future road by using a grader to rip and mix the soil. Ensure the soil has been excavated to the desired depth of the road.
EQUIPMENT NEEDED
Apply PermaGroung-EnZyme
Using a water truck, mix PermaGround-EnZyme and water. Then, spray the soil with the mixture.
Mix the Soil
For best results, use a blade attachment to mix the soil by blading the soil from side to side and up and down the path. This process ensures that the soil is uniformly moistened and the PermaGround-EnZyme will be uniformly applied.
Compaction
Using a compactor, ideally a sheepsfoot compactor, begin compacting the soil in 3-6 inch lifts. Once the soil has reached nearly optimum compaction, it is best to use a drum compactor to complete compaction and level it.
Let the Permentation/ Permalyzation Process Begin
Once the road has been compacted, the road is ready for light traffic. The soil will be fully cured within 72 hours.
Open today | 09:00 am – 05:00 pm |
We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.